Skip to content
International Academy of Science, Technology, Engineering and Management (IASTEM)

Conference Proceedings

11TH IASTEM INTERNATIONAL CONFERENCE, Chengdu, China 15-01-2016

← All proceedings

Proceedings cover: 11TH IASTEM INTERNATIONAL CONFERENCE, Chengdu, China 15-01-2016

11TH IASTEM INTERNATIONAL CONFERENCE

Chengdu, China 15-01-2016

ISBN 978-93-85973-02-4

3 papers

  1. Causes And Consequences Of Job Stress In Construction Projects: Literature Review From 2000 Onwards

    Hamed Rashidian, Towhid Pourrostam

    Paper ID IA-ICCAECHNG-15016-721 · Pages 1-5

    Abstract

    In the past, review of literature on causes and effect of job stress in construction projects have been done by few authors. In this paper the literature related to causes and effect of job stress in construction projects practices and theory was reviewed during26 last years. Results of the reviewed papers show that such as important causes of stress were: work overload, job security, poor working environment, and inadequate salary they are the most important issues that lead to job stress in construction projects. In addition, the findings show that stress is one of the root causes of low efficiency of construction sites' workers. Moreover, workers have more stress at home than work environment and these effect on their health and efficiency at work environment negatively. Keywords- Stress causes, Stress effects, Construction project

    Download PDF: Causes And Consequences Of Job Stress In Construction Projects: Literature Review From 2000 Onwards
  2. The Study Of The Role Of Stress Management In Civil Projects’ Construction (Case Study: Lorestan Province Road Building Projects)

    Hamed Rashidian, Towhid Pourrostam

    Paper ID IA-ICCAECHNG-15016-729 · Pages 6-9

    Abstract

    In the present world, stress has been known as one of the calamities of human force and job stress has been considered by researchers and also World Health Organization (WHO) as an annoying phenomenon. It has been introduced as an important phenomenon in social life and a serious threat for health of labor force in the world. For this reason, researchers have conducted extensive studies in this field. In this regard, the present paper has been conducted to study role of stress management in civil projects’ constructions. The most important causes of stress in road building projects were identified through literature review, field studies and interview with employers, consultants and contractors. Then, the research questionnaire was compiled by classifying these cases. By distributing the questionnaires and collecting them, the obtained information was analyzed with SPSS software. The results show that “no complete removal of the conflicts before start of the project operations” employer, consultant and contractor was the highest job stress factor which employer applies to the active forces in the project. Also, “monthly salary” was found as the most stressful factor of the working forces of employers, consultant and contractor. It was specified that “educational level” and “working experience of people” does not affect on their stress but “timely payment of wage” reduces stress and “high working volume” increases stress. Key words- job stress, stress management, road building projects

    Download PDF: The Study Of The Role Of Stress Management In Civil Projects’ Construction (Case Study: Lorestan Province Road Building Projects)
  3. Approach For Determining Operative Costs In A Dynamic Environment For Decentralized Controlled Pre-Storage Zone

    Lukas Kopecki

    Paper ID IA-ICRAETCHIN-15016-731 · Pages 10-14

    Abstract

    Costs in dynamic environments especially in high complex pre-storage zones with hundreds of continuous conveyor systems and unpredictable shifts in arrival and departure time of goods is hard to determine. The dynamic behavior effects on the transportation times and therefore a direct effect on the automatized and decentralized control continuous conveyor system. Jamming and blocking results in non-continuous motor behavior, e.g. stop and go. Because high complex pre-storage zones are cost expensive a simplified model is presented able to calculate expectable costs for such system. Keywords- Computer Integrated Manufacturing,Mechatronics and Automation, Production Planning and Control

    Download PDF: Approach For Determining Operative Costs In A Dynamic Environment For Decentralized Controlled Pre-Storage Zone