IASTEM INTERNATIONAL CONFERENCE
San Diego, USA 12-12-2016
2 papers
-
Methodology for Establishing A Schedule Simulation System for Railway Infrastructure Project Using The Concept of Standard 4d Framework
Hyeon-Seong Kim, Sang-Mi Park, Sun-Ju Han, Leen-Seok Kang
Paper ID IA-ICCAEUSA-12126-2491 · Pages 1-3
Download PDF: Methodology for Establishing A Schedule Simulation System for Railway Infrastructure Project Using The Concept of Standard 4d FrameworkAbstract
Recently, various studies about BIM and its application cases have been reported, however, most of them are based on 3D modeling technology for design stage and some application of 4D CAD systems consists merely of passive BIM functions which provide simple visual information. This study proposes essential functions to develop a 4D CAD system specialized in project management for construction stage of railway infrastructure. For this purpose, this study also proposes a methodology for establishing a location-based simulation system which is adequate for linear facilities. Index Terms- Building information modeling, Railway Infrastructure, Schedule simulation system, Standard framework
-
Application of Mathematical Statistics in Drilling
Ibrahimov Rafig Salman Oglu, Ibrahimova Rana Rafig Gizi
Paper ID IA-ICSTMUSA-12126-03 · Pages 4-6
Download PDF: Application of Mathematical Statistics in DrillingAbstract
The article is devoted to questions to determine the values of hydraulic fracturing. There are several ways to determine the value of the hydrofracturing pressure. We have given specific recommendations of their choice. In connection with this there are mentioned results on the application of mathematical statistics in the article to determine the hydraulic fracturing pressure in drilling.